Showing posts with label Library construction. Show all posts
Showing posts with label Library construction. Show all posts

June 6, 2023

Construction Update • Inside

Yes! We are open.

A temporary construction wall is now in place on the main floor. When you enter the library, turn left to access the elevators and library services, collections, offices, and the Center for Academic Support (7th floor). Remember, visitors should use the main doors to enter and exit the library building.

Library services located on the ground floor include: circulation, OhioLINK, and interlibrary loan; reference, technical services, and acquisitions; and an inside book return.  The after hours book return is located next to the library's brown loading dock doors, across from the Chapel.


Library Main Floor
 

Library Entrance & Elevators
 

Library Entrance & Building Directory
 
 

June 1, 2023

Construction Update • Outside

Cafe & North Side Progress

Have you had an opportunity to walk along College Avenue to view progress being made on the library cafe and north side of the building? It's a beautiful day in the neighborhood and the perfect time for a stroll.  Here are a few photos of the progress being made on the cafe and north side of Archer Library.

Cafe Side View / Formerly Patio

Cafe Front View

Cafe Side View

April 20, 2023

Library Construction • Outside

A Bird's Eye View
Photos taken from fourth floor windows offer a bird's eye view of  construction taking place on the north side of Archer Library. The area is completely fenced in for safety and they are preparing safe entry for construction vehicles needed throughout the summer. Interested in a different view?  Check out the Library News blog for an Up-Close perspective of the construction.


April 17, 2023

Library Construction Updates

News & Updates
Renovations on the west side of Archer Library's main floor and the patio have begun!  The library's main floor entrance and exit doors remain available for use. Construction company signage should be in place by the end of the week; areas are identified as closed for your safety, and protective plastic sheeting is in place for interior spaces.
  • The library patio and all entrance points to the outside space are closed. Fencing is in place prohibiting access to both exterior entrances; interior exit doors are closed and behind plastic.
  • The west side of the main floor, from the stairwell to the north wall, is closed. 
  • The north entrance area, directly behind the circulation desk, is closed.

Library computers and printers on the main floor remain available for use. Computers from the west side of the main floor have been relocated to upper floors.  All library computers are part of campus FindMe Printing. It is possible to work on other floors and print to the main floor print area.

Library Patio closed
Library Patio entrance closed

photograph of library west side
West side of main floor, closed.

Photo of patio entrance and north side closed
North side interior entrance closed.

This post was originally published on Archer Library's News & Information Blog on 4/12/23